www.DesignBuildAz.com

WEBSITE INDEX

Home Page

Stewart Construction

Our Recent Design Build Projects:

  Keyhani Addition in Scottsdale, Az.

Custom Residence at Artesano in Troon Canyon, Scottsdale  

Custom Residence at Whisper Rock Estates, Scottsdale 

Custom Residence in Scottsdale, Az.

Custom Residence in Surprise, Az.

2-Story Home Addition, Tempe, Az.

Architectural Services:

Architectural Design

Architectural Production

About our Company


 

  CONDO  RENTAL @ LAS PALOMAS RESORT (Ocean Front & Sunsets) in Rocky Point, Mexico   

 

  Mexico Photo Gallery


OTHER WEBSITES of INTEREST:

  Games and Puzzles

    

 Free Spanish-English Dictionary

 The Best FREE Online Encyclopedia...Wikipedia

  Free Encyclopedia

          

     Best Team of the WEST !!!

   

    


      

      The Blue Book

    89.9 FM & 88.7 FM. The best in contemporary rock...Enjoy !!!

     Catch up on the latest design and construction news !!!

   Open up your personal online stock trading account today !!!

       Download this excellent file management program for FREE !!!

      


THE INVESTMENT CORNER:

  Welcome to The Investment Corner !!

MoneyCentral Stock Quote
Enter Symbol(s) 

 Stocks To Watch...

         Think  Bullish !!!

.

 

  CUSTOM RESIDENCE- Lot #17 @ Whisper Rock Estates, Scottsdale

 

Close up of tile pavers at pool patio

Ceramic tile accent at pool wall

Elevation of rear patio

Close up of Foyer columns

View from master Bedroom doorway

Front elevation. Pavers and landscaping soon to follow.

 

View of Great Room

Close up of Great Room fireplace

Close up of garage doors

Guest quarters wing

Two months away from occupancy

 

 

 

 

 

 

 

Groin vault ceiling at Hall intersection.

Drywall finished with all joints taped.

View of front entry composition

Arch between the Kitchen and Breakfast area.

View from Master Bath of barrel vault leading into Master Bedroom

Drywall phase at 60% completion

Arch over bath tub

Drywall at barrel arch over hallways.

Ceilings beginning to take shape

Drywall finished in Garage area.

Windows installed. View of front courtyard entrance.

View of Courtyard entrance

View of rear Sitting windows

View of rear patios and door systems installed

Close-up view of rear patio

A new family of Quail decided to move in...

View of Master bedroom door system

Dome ceiling over Foyer. All electrical is in place.

View looking towards the Dining Room and Foyer.

Mechanical systems are in place and awaiting inspection.

Groin vault framing at intersecting corridors

Framed arch detail over tub with frame out for arched window.

Roof is ready for clay tile to be loaded. All roof vent holes have been cut out.

Street view of Left Elevation

Front Elevation viewed from across the street

View of Master Bedroom area

Close-up of front circular entrance

Right side elevation

View of Master Bedroom fireplace and ceiling framing

View from Master Bath toilet room

View from great Room towards Foyer

Close-up of faux chimney over Bedroom #2

Front arch shaped and in place

View from Guest Bedroom patio towards garage

Happy New Year !!!

Framing stage begins. This is day two. Estimated time of completion 5 weeks.

Simultaneously, grout is being poured into the Living Room fireplace (at 75% completion).

Over all view of wall framing of Bedrooms and Home Theater.

View of Garage wall framing and entrance Foyer

The Guest House front wall goes up...

Concrete slab has been successfully poured. Construction joints in place.

View of Garage freshly poured concrete slab. Framing to begin right after the Christmas break.

Herringbone pattern firebox at Great Room fireplace begins.

The masonry fireplace at Guest bedroom has begun

Fireplace at Living Room and Master Bedroom with green tag. Slab to be poured tomorrow...

Close up of green tag and a "tagged" bird.

This bird has a liking for the camera and our project. As I'm told he is a frequent visitor. Construction is for the birds :--)

Concrete mixer and pump arrive to pour the concrete footings

Fireplace footings with freshly poured concrete

Sewer connection prior to inspection

Sewer line to the main house and cleanouts.

Underground plumbing at Guest House

Plumbing lines at Master Bedroom toilet (by foyer).

View of plumbing for Laundry Room and Bath beyond.

Garage concrete stems finished and bolts in place.

View of Foyer stems and shear straps. Plumber in background reading plans.

View of rear wall concrete stems

Excavation begins for sewer connection. Sewer line will be clear of fence. Inspection anticipated for Monday.

Stems being poured as viewed from the garage corner

Concrete crew pouring stem around Sitting Room at master bedroom area.

Concrete crew hard at work...

Detail of circular concrete footing at the Foyer

Photo of reinforcing bars at garage retaining wall...ready for concrete.

Close up of rear patio concrete footings

The second scheduled delivery arrives and concrete crew hard at work. Pouring footing at rear bedroom corner

Trench for concrete retaining stem at garage corner. Additional rebar shall be placed per detail and "L" bars were instructed to be replaced since the short legs are too short. Currently at 4'', I instructed them to replace with 12'' long legs per detail.

Photo of casita corner footing and rebar placement. Inspection by Tuesday.

Hard to tell from this photo, but all footing trenches are excavated.

Fluorescent colored markings on soil to prepare for footing excavation (view of Foyer location)

Excavation for footings to begin tomorrow...

Land surveying and locating pre-determined building corners and verifying elevation datum

 

Ground Breaking BEGINS !!!  Lot is roped off and ready to go

View of construction hose bibb in place and operational

 

Komatsu digging out the front garage corner

 

Trench digging for the concrete footings to start next week

 

 Back to the Home Page

 

       Copyright 2010  DesignBuildAz.com, CDS-Designer.com &  EfrenRuiz.com.  All Rights reserved.

                                              Last Update: 07/18/10