|
|
|
SERVICES:
PROJECTS:
BEACH RENTAL: 2 BR CONDO RENTAL @ Las Palomas Golf & Beach Resort (Ocean Front) in Rocky Point, Mexico
Free Spanish-English Dictionary
|
For more on Artesano and Troon click here: http://www.azgolf-prop.com/golf-communities/troon-cc.htm
View of rear elevation
Continued view of rear elevation
Elevation of front courtyard
Detailed close up of front entrance
Observation deck railing now installed
Close up of railing at Observation Deck
View from Guest bedroom window of observation deck railing.
Close up of Foyer water fountain
Close up of Viking range and overhead exhaust
Photo of Kitchen
Expresso coffee machine cabinet
Satisfied owner from his Observation Deck
Close up of Observation Deck
Rear pool elevation
Close up of rear elevation
Close up of tub in Master Bathroom Two months away from occupancy
Styrofoam has been added getting ready for stucco
View of front Entry composition
View of bedroom wing at front elevation
Photo of rear patio. Foam is complete.
Windows over circular stairs.
Roof tile loaded and exterior doors and windows installed.
Exterior elevation ready for exterior foam system
Close up of windows which will be located over the stairwell.
Windows at Guest Bedroom installed.
Close up of window at Home Theater.
Upper floor roof trusses are now in place...
The second floor begins to take shape
View looking down corridor at upper floor.
Picture of Observation Deck beginning to take shape
View of private stairwell and entrance canopy
View from new Home Theater window...not too shabby !!!
Progress at second floor. All moving along...
Views from upstairs Office
Overall view of the progress. Very few questions...no surprises. This is good..!!!
View of Master Bedroom side...soon the roof trusses.
Floor trusses have arrived...
View from rear pool patio
Floor trusses in place over Master Bedroom
Floor trusses at stairwell
View of rear patio
Week one of framing complete
Owner and builder discussing important project matters
Complex framing structure at balcony framing over Master Bedroom
Large beams with joist hangers and view of stair shaft
View from Mechanical Room corner
Framing begins !!!
After the first day 1/3 of the exterior frame walls were erected.
Close up view of the Bedroom area towards the front.
At the same time, the connection to the sewer tap was established. And backfilling began.
Close up view of the enormous trench that was dug out.
Backfilling will be finished today.
Digging continues attempting to locate the sewer line.
First wave of lumber arrives. All walls are marked on the slab ready for framing tomorrow.
Finally located the sewer line. However the elevation of the line is too shallow. Further digging was required.
Digging out from under the street attempting to find a successful connection point. It was 20 ft. deep and 5'-0'' under the sidewalk.
Concrete slab poured day !!!
The entire house slab will be poured today.
Close-up of fireplace block out
The bank inspector showed up to verify progress (red shirt).
Trowelling the slab as it is freshly poured.
Saw cutting control joints will occur tomorrow. Nice job guys !!!
Soon the area will be ready for the concrete slab
A.B.C. placement and compaction now underway
Close-up of clean outs outside the Bedroom side
Close-up of plumbing lines under Bedroom side
Close up of plumbing system at Kitchen
Waste lines trenches complete and underground plumbing lines going in.
Rough plumbing underway along concrete retaining stem
All stems poured and depressed stems blocked out.
Retaining wall has been poured at perimeter.
Concrete stems in place
Forms for exterior wall footings in place
Forms go up for concrete stems
Pouring begins as soon as delivery arrives
Pump ready for concrete footings After a three month delay, due to soil bearing capacity issues, construction resumed... _______________________________________________________________________________________________________
Concrete footings have been poured.
Soon to come after the Christmas break, will be the concrete stem forms and inspection.
Close-up view of the Master bedroom fireplace footing and mystery photographer (shadow).
Concrete pump settles in awaiting the arrival of concrete mixer.
Ready for concrete footing pour
Concrete footing pour underway....
Reference points requested for Graham to perform
Need to verify Top Of Wall (TOW) heights and driveway elevations
Along driveway wall, the following points were requested
View of lot and stake locations
More stakes as provided by the survey crew
Backfiling is 95% complete.
View from rear garage corner while standing in the setback
View from same location looking towards the front of the lot
View from rear patio wall corner while standing in the setback...dirt mound is GONE !!!
View of master bedroom side retaining wall...compaction remains to be done
View of retaining wall corner while standing at grade level
Next step is compaction of soil to minimum 95% or 1,500 p.s.i. bearing capacity (certified).
Finally...backfilling begins today. View of rear pool area, nearly 90% complete.
View of fron retaining wall, now with waterproofing and 4'' perforated drainage pipe.
View of waterproofing and perimeter drain to daylight beyond. Trucks moving earth in background.
View from side towards the front retaining wall. Mound of dirt dwindling...
View of rear retaining wall from the property line
Backfilling continues at the front courtyard area
Additional equipment used for this phase.
Overall view of our building area being prepared for concrete footings...our next phase.
Missing rebar appears...
All bolts in place and ready for framing crew
View of finished front retaining wall
Instructions left behind in chalk for waterproofing crew and perimeter drain extent. Backfilling by early next week.
Chalk marks missing rebar for future spa wall. In Marco's absence, I went around leaving little "post-its" everywhere.
Chalk marks missing bolts and grouted cells and other work instructions.
Remaining work to be performed tomorrow, marked on the wall for workers tomorrow. The front walls were chalked as well.
View of finished pool retaining wall. Most of this wall will disappear once the soil is backfilled.
View of finished rear corner garage wall. This whole area will be backfilled up to the bottom of the drainage block openings.
Solid grouting all the block cells of all retaining walls begins today !!
View of curved front retaining wall and cement trucks. Wall yet to be cut and sloped per plans.
View of stepped retaining wall along Master Bedroom side
View of driveway retaining wall, one block course away from completion.
Photo from driveway of curved, and eventually sloped front retaining wall.
Photo from future mechanical yard adjacent to the garage, one block course away from completion
Another view of the stepped retaining wall on Master Bedroom side
Close up view of Master Bedroom privacy screen wall.
View of front entrance courtyard near completion.
Photo of the rear patio retaining wall...two more block courses remain
The west side retaining wall nearly ready for inspection
Retaining walls continue to be erected
Masons finishing up the southeast corner, at the end of the driveway
The block for the retaining walls finally arrives.
Work can now begin to finish the retaining walls. A couple inspections still pending.
Marco glad that the masons are at work...Nice job !!!
Detailed view of the southwest corner by the pool. We instructed them to begin at this point to allow ample time for curing before backfilling.
Detailed view of the west wall currently under construction.
Freshly poured footing along east wall (garage side)
Rear retaining wall footing being poured
Last remaining portion of retaining wall footing will be poured today.
Stepped footing along west wall (M. bedroom) ready for the block wall portion of the retaining walls.
Twenty four hours later the concrete showing signs of drying. Block work to begin tomorrow...
Close up shot of Pinnacle Peak viewed from residence
Cement truck descends as second scheduled pour arrives
The stepped footing along the Master Bedroom side (west) is poured
Concrete footing poured at front corner retaining wall
Trucks barely maneuvering in cramped conditions
Front retaining wall concrete footing being poured
Close up of front retaining wall footing
All rebar are in their proper place
Master bedroom rebar side all in place correctly
The footing at the rear has been lowered 12'' as we requested
All rebar at the critical front corner all placed correctly
Worker putting final touches for inspection on Monday. Next...concrete pour
Rebar in place for the garage side
Rebar in place for north retaining wall (correct and per detail)
During a meeting with Rutilio, we agreed that these rebar are incorrectly placed. They need to be reversed to match the retaining wall in the front.
Rebar for the rear retaining wall, in correct position, but footing depth may be too shallow. Looks more than 5 inches. Please verify...
Forms up at rear retaining wall. Ready for rebar placement. After rebar is in place, an inspection will be called in.
Trench dug out and ready for the concrete forms.
Concrete forms are in place for the Master Bedroom side stepped retaining wall.
Rear wall forms and masonry location strings (white lines). They should be completed within the next week and a half.
Rutilio and Marco heading up the retaining wall phase. This is a stepped footing along Master Bedroom side.
Workers digging out the footing and setting forms for the retaining wall at the severe corner.
Trench has been dug out for the garage side. Ready for forms and rebar
Workers prepare the front corner retaining wall for the concrete forms to come.
Heavy machinery roles in to continue the excavation process
The front part of the lot has been excavated.
Trench digging for retaining wall along garage side of the house
View toward the front of the lot...large mound of dirt to the right
Large dirt mound. Some will be used for backfill...the rest hauled out.
Say goodbye to this tree. It will be in the way of the front retaining wall
View along front retaining wall location, with still 2'-0" more to dig...
Retaining wall construction begins
In the beginning.....Street view of Lot #9 prior to construction
In the beginning.....Street view of lot from future driveway
|
|
Copyright 2012 CDS-Designer.com. & EfrenRuiz.com All Rights reserved. Web Design by CDS-Web@hotmail.com Last Update: 05/02/11 |